Unit prices

The whole sheet, broken out by division the way an engineer's estimate is broken out, so a district can size a project before it spends money on design. Planning ranges with a stated basis — not a bid.

W, Potable water SS, Sanitary sewer Reviewed October 2026

A unit price is not a number, it is a number plus the four conditions it assumes. Publish the number without the conditions and it is worse than useless, because somebody will build a budget on it.

So here is how to use this sheet. Find the line that matches your work. Read the range as a spread, not an average: the bottom of it is shallow, dry, open ground and easy access; the top of it is deep, wet, congested and under pavement that has to be put back the way the jurisdiction specifies. Then read the division note, which says what the band actually depends on, and the basis statement at the foot of each table, which says what is not in it.

What is genuinely missing from every number on this page is your site. Two identical pipes in two identical towns can differ by a factor of three, and almost none of that difference is the pipe. The variables that decide it are depth, groundwater, what is already in the corridor and what is on top of it. Those four, in that order, move more money than anything else in this trade.

Some lines on this sheet do not carry a price and never will. A tie-in to a live main is priced from the plant, with the operators present, because what it costs is decided by what carries the flow and what happens if the window overruns — and those are attributes of your system, not of the fitting.

A quantity is never published without its unit

Every figure on this page carries the unit it is measured in. A price per linear foot and a price per cubic yard are not comparable numbers, and a sheet that lets them be confused is how a budget ends up wrong by an order of magnitude.

Units of measure

LF
Linear foot
EA
Each
CY
Cubic yard
SY
Square yard
SF
Square foot
LS
Lump sum
MO
Month
DAY
Day

Excluded from every figure

  1. Engineering, surveying and permitting
  2. Bonds and insurance
  3. Owner-furnished materials and equipment
  4. Easement and right-of-way acquisition
  5. Applicable tax
  6. Undisclosed or differing site conditions

On a public project the bonds and insurance are a real percentage of the whole. Carry them as their own budget line rather than assuming they are buried in somebody's unit price.

Sizing a project this week?

Telephone with the length, the depth and the surface and the range narrows on the call.

Call (303) 482-3059

Mon–Fri 7:00 AM–4:30 PM MT

C 2.0 The sheet

Priced by the unit, by division

Row bands are the APWA uniform colour code for what is in the pipe: W, Potable water potable water, SS, Sanitary sewer sanitary sewer, unbanded where the line covers both or neither. It is the same code that gets painted on the street before anyone digs, and it is the fastest way to read a bid tab.

Division 02 Water distribution and transmission

Depths are cover over the crown. Prices include bedding, backfill, compaction, pressure and leakage testing, disinfection and bacteriological clearance.

Division 02 pay items · planning unit prices, reviewed October 2026
Item Description Unit Unit price
02.10 8″ PVC water main, 6′ coverOpen cut, normal access, dry ground LF $185–$310
02.15 8″ PVC water main, 8–12′ coverTrench support required LF $255–$445
02.20 12″ PVC water main, 6′ coverOpen cut, normal access LF $245–$420
02.25 16″ ductile iron water mainRestrained joint, thrust restraint, testing LF $395–$690
02.30 24″ transmission mainDuctile iron or steel, depth dependent LF $640–$1,180
02.40 Fire hydrant assemblyHydrant, valve, tee, thrust block, restoration EA $8,400–$14,500
02.45 Gate valve, 8–12″, with boxSet, restrained, operable EA $3,600–$7,200
02.50 Water service, ¾–1″, short sideCorporation, tubing, curb stop, box EA $2,100–$3,900
02.55 Water service, ¾–1″, long sideIncludes road crossing EA $4,200–$8,800
02.60 Pressure reducing valve stationVault, valves, piping, instrumentation EA $54,000–$185,000
02.70 Connection to live mainTap, tie-in or cut-in, with shutdown coordination EA site visit

Division 03 Gravity sewer and manholes

Depth bands matter more than diameter on gravity sewer. Price the depth, then the diameter. Prices include air and mandrel testing and post-construction CCTV.

Division 03 pay items · planning unit prices, reviewed October 2026
Item Description Unit Unit price
03.10 8″ PVC gravity sewer, 8–12′ depthOpen cut, dry ground LF $210–$395
03.15 8″ PVC gravity sewer, 12–18′ depthTrench support and dewatering as required LF $340–$640
03.20 8″ PVC gravity sewer, over 18′ depthEngineered shoring, staged spoil handling LF $560–$1,150
03.25 15–18″ gravity sewerDepth dependent LF $390–$720
03.30 24–36″ gravity interceptorDepth dependent, RCP or PVC LF $620–$1,480
03.40 48″ sanitary manhole, 8–12′Base, barrel, cone, frame and cover, vacuum tested EA $7,800–$13,500
03.45 48″ sanitary manhole, over 18′Deeper barrel, dewatering, coated EA $16,500–$38,000
03.50 60–72″ manhole or junction structureCast-in-place or precast, lined EA $24,000–$72,000
03.55 Manhole rehabilitation and liningClean, repair, cementitious or epoxy liner EA $4,800–$14,000
03.60 Sewer service reconnectionTo the property line, with reinstatement EA $2,400–$5,200
03.70 Connection to live sewerTie-in with flow control or bypass EA site visit

Division 04 Force main and pipeline rehabilitation

Rehabilitation is priced on the condition assessment, so a CCTV survey comes before a number rather than after it.

Division 04 pay items · planning unit prices, reviewed October 2026
Item Description Unit Unit price
04.10 Force main, 6–12″ HDPEFused, tested, with air release assemblies LF $220–$460
04.15 Force main, 14–20″HDPE or ductile iron, restrained LF $385–$780
04.20 Trenchless crossing, bore and jackUnder road, rail or stream, casing included LF $620–$1,850
04.25 Horizontal directional drill, 8–16″Entry and exit pits, pullback, testing LF $340–$920
04.30 Cured-in-place pipe lining, 8–15″Cleaning, CCTV, liner, service reinstatement LF $140–$310
04.35 Cured-in-place pipe lining, 18–36″As above, with bypass while curing LF $285–$680
04.40 Pipe bursting, 8–12″Static burst, HDPE replacement, reconnections LF $195–$430
04.50 CCTV inspection and cleaningPre- and post-construction, with deliverable video LF $4–$14

Division 05 Structures and water-retaining concrete

Water-retaining concrete is a different product from structural concrete: low-permeability mix, crack-control reinforcing, a waterstop at every joint, a planned placement sequence and a hydrostatic test before anybody accepts it.

Division 05 pay items · planning unit prices, reviewed October 2026
Item Description Unit Unit price
05.10 Structural excavation and shoringIncluding dewatering where required CY $28–$62
05.20 Cast-in-place water-retaining concreteForming, reinforcing, placing, finishing, curing CY $1,450–$2,600
05.21 Structural concrete, non-water-retainingSlabs, foundations, equipment pads CY $820–$1,480
05.30 Waterstop and joint sealantPVC waterstop, hydrophilic strip, sealant LF $46–$95
05.40 Hydrostatic leakage testingFill, hold, measure, report, per structure EA $9,500–$34,000
05.50 Precast vault, set and sealedDelivered, set, sealed, frame and cover EA $18,000–$72,000
05.60 Protective coating, immersion serviceSurface preparation to standard, coating, holiday testing SF $22–$58
05.70 Aluminium handrail and gratingOperator access, to code LF $145–$290

Division 06 Process mechanical and piping

Where equipment is owner-furnished, the split between receiving, setting, connecting, commissioning and certifying is agreed in writing before delivery. That one page prevents most of the disputes this scope otherwise produces.

Division 06 pay items · planning unit prices, reviewed October 2026
Item Description Unit Unit price
06.10 Process mechanical installationEquipment received, set, aligned, grouted, connected LS by scope
06.20 Process piping, ductile iron, 12–36″Pipe, fittings, restraint, supports, testing LF $390–$1,250
06.25 Process piping, stainless, 4–12″Welded, passivated, supported, tested LF $285–$740
06.30 Valves and gates, processSet, actuated where required, stroked and proven EA $3,200–$48,000
06.40 Blower or pump set, installedPer unit, excluding the equipment itself EA $14,000–$78,000

Division 08 Bypass and temporary works

This division is the price of keeping the plant in compliance while it is rebuilt. A bypass is sized on peak wet-weather flow, not average flow, and it runs and is proven before anything is demolished.

Division 08 pay items · planning unit prices, reviewed October 2026
Item Description Unit Unit price
08.10 Bypass pumping, 6–12 MGDPumps, suction and discharge, redundancy, 24-hour attendance DAY $3,200–$9,400
08.11 Bypass pumping, 1–6 MGDSmaller plant or a single process train DAY $1,400–$3,600
08.12 Bypass pumping, under 1 MGDLift station or a short reach of collection system DAY $620–$1,700
08.20 Bypass mobilisation and setupDelivery, rigging, piping, proving under real flow LS $28,000–$145,000
08.30 Temporary process equipmentScreening, pumping or dosing carried temporarily MO by scope
08.40 Standby crew and equipmentHeld on site through a shutdown window DAY $4,200–$11,000
08.50 Temporary water supplyPotable, chlorinated, sampled, to affected customers DAY $1,100–$4,600

Division 09 Shutdown, demolition and rehabilitation

A planned tie-in is not a line item that can be priced from a drawing set. It is priced from the plant, at the plant, with the operators present.

Division 09 pay items · planning unit prices, reviewed October 2026
Item Description Unit Unit price
09.10 Shutdown and tie-in, plannedRehearsed, low-flow window, written procedure, contingency in place EA site visit
09.20 Selective structural demolitionInside an operating facility, with protection CY $95–$340
09.25 Equipment removal and disposalDisconnected, removed, recycled or disposed LS by scope
09.30 Structure rehabilitation and coatingSurface preparation, concrete repair, protective coating SF $18–$52
09.40 Confined-space entry, attendedWet wells, digesters, vaults, with rescue provision DAY $1,900–$4,200
09.50 Grouting and crack injectionStructural or leak-sealing, per linear foot of crack LF $38–$140

Division 10 Testing, commissioning and training

Commissioning is the phase most often compressed in a schedule and the phase where compression does the most damage, because the people who lose are the operators who have to run the plant afterwards.

Division 10 pay items · planning unit prices, reviewed October 2026
Item Description Unit Unit price
10.10 Commissioning and functional testingPer system, against written acceptance criteria EA $6,500–$42,000
10.20 Operator trainingOn the systems delivered, with written materials DAY $2,400–$4,800
10.30 As-built record drawingsSurveyed, drafted, to the owner's CAD standard LS $8,500–$52,000
10.40 O&M manual compilationAssembled, indexed, delivered in the required format LS $6,200–$34,000

Division 11 Surface restoration

On a residential street the restoration is the project as far as the public is concerned. Nobody sees the pipe; everybody sees the patch, the driveway and the lawn.

Division 11 pay items · planning unit prices, reviewed October 2026
Item Description Unit Unit price
11.10 Asphalt pavement restorationFull-depth patch, tack, compaction, striping SY $62–$135
11.15 Asphalt mill and overlayFull lane width where the jurisdiction requires it SY $28–$68
11.20 Concrete flatwork restorationSidewalk, curb, gutter, driveway, to the nearest joint SY $95–$195
11.30 Landscape restorationTopsoil, seed or sod, irrigation repair SY $16–$48
11.40 Traffic controlPlan, signs, devices, flagging, per day of active work DAY $680–$4,200

Division 12 Lift and pump stations

A lift station is the smallest thing in a collection system and the one most likely to put sewage in a creek. The parts that matter most are the parts nobody photographs: the alarm path and the generator under load.

Division 12 pay items · planning unit prices, reviewed October 2026
Item Description Unit Unit price
12.10 Wet well, 8′ diameter, 20–30′ deepPrecast or cast-in-place, coated, with dewatering EA $145,000–$385,000
12.20 Valve vault and pipingVault, valves, check valves, piping, supports EA $68,000–$165,000
12.30 Submersible pumps, set and testedPer pump, guide rails, base elbow, cabling EA $24,000–$86,000
12.40 Electrical service and controlsService, control panel, level control, wiring LS $95,000–$280,000
12.50 SCADA integration and alarm pathPoints to the owner's system, tested end to end LS $28,000–$95,000
12.60 Standby generator and transfer switchSet, connected, commissioned, load-bank tested LS $78,000–$240,000
12.70 Odour controlCarbon or biological, per installation LS $42,000–$180,000
12.80 Station site work, fencing and accessDrive, turnaround, fencing, grading, drainage LS $46,000–$155,000

Division 13 Site civil and earthwork

The scope the operators live with. A plant road that holds ice, a yard that ponds, a valve box buried under six inches of regrade: all small, all permanent, all avoidable.

Division 13 pay items · planning unit prices, reviewed October 2026
Item Description Unit Unit price
13.10 Site grading and earthworkCut, fill, moisture conditioning, compaction CY $14–$38
13.20 Structural fill, placed and testedImported, placed in lifts, density tested CY $42–$88
13.25 Rock excavationWhere encountered and classified as rock CY $58–$185
13.30 Storm drainagePipe, inlets, outfall, erosion protection LF $165–$390
13.40 Plant road and hardstandSubgrade, base, asphalt or concrete SY $68–$155
13.50 Erosion and sediment controlInstalled, maintained through the project, removed LS $12,000–$68,000
13.60 Dewatering, sustainedWells or sumps, treatment and discharge permit compliance DAY $840–$4,800

Unit prices are USD planning ranges for the Colorado front range, exclude engineering, surveying, permitting, bonds, insurance, owner-furnished materials, easement and right-of-way costs and any applicable tax, and assume normal access and no undisclosed site conditions. They are published so a district can size a project before it spends money on design. They are planning ranges, not a bid. Divisions are numbered for this sheet only and do not correspond to a CSI MasterFormat division. Reviewed October 2026. A price for your project comes from a bid or a proposal against a defined scope. See the disclaimer.

C 3.0 The four variables

Same pipe, three times the price

Every range on this sheet is a range because of these four, and they are the four questions worth answering before anybody asks for a number.

What moves a unit price, in order of how much money it moves
Variable Bottom of the range Top of the range Why
Depth Under 8′, standard trench box Over 18′, engineered shoring Different support system, bigger equipment, spoil handled twice, production per day falls sharply
Groundwater Dry trench, no dewatering Sustained dewatering with treated discharge Changes the method, adds a day rate, and the discharge itself needs a permit and monitoring
Congestion Open ground, nothing else in the corridor Threading between gas, electric, fibre and storm Locates, potholing, hand excavation near existing services, and a fraction of open-field advance rate
Surface Field or gravel, seed restoration Arterial pavement with staged traffic control Traffic control plan, night work, full-lane pavement replacement to the jurisdiction's specification

Notice that only one of the four is about the pipe, and it is the cheapest one to change. That is why a diameter on its own is not enough to price a pipeline, and why an estimate built from a single number per foot is usually wrong.

C 4.0 Worked through

The same 2,000 feet, twice

Two thousand linear feet of eight-inch gravity sewer, identical pipe, identical town. Built from this sheet, with nothing added and nothing hidden.

2,000 LF of 8″ gravity sewer · built from the sheet above
Item Easy case Hard case
Conditions 10′ deep, dry, undeveloped corridor, gravel surface 16′ deep, groundwater, congested residential street, asphalt
Pipe, 2,000 LF $420,000 at $210/LF $1,000,000 at $500/LF
Manholes, 5 EA $39,000 at $7,800/EA $92,500 at $18,500/EA
Service reconnections none $96,000 24 EA at $4,000
Restoration $12,000 gravel and seed $188,000 asphalt and flatwork
Traffic control none $54,000 45 DAY at $1,200
Dewatering none $81,000 45 DAY at $1,800
Order of magnitude $471,000 $1,511,500

Same pipe, same length, same town, and a spread of more than three to one. Neither column is padded and neither is a bid. Both are arithmetic done on the sheet above, which is precisely the arithmetic we would rather you were able to do before the first meeting than after the bids come in. Add engineering, permitting, bonds, insurance and tax on top of either column.

Pipelines, in detail   What we self-perform

C 5.0 Questions

Questions about the prices

The general questions — bidding, bonding, insurance, weather days, pay applications, retainage — are on the FAQ page. The commercial terms are in the payment and cancellation policy.

Why publish prices at all? Nobody else in this trade does.

Because a utility district cannot ask its board for money it cannot name, and the usual answer — call us for a quote — is useless at the point where the decision actually gets made. A public works director sizing a project two budget cycles out needs an order of magnitude before there is a drawing to bid. Publishing ranges with a stated basis is more useful than a number nobody will say out loud, and it costs us nothing we were not going to tell you in the first meeting anyway.

How wide are these ranges, really?

Wide, on purpose, and the width is information. An eight-inch water main between $185 and $310 a foot is not vagueness; it is the honest spread between a shallow line in dry ground in open field and the same pipe deep, wet, and threading between existing utilities under an arterial. A narrower published number would be less true, not more useful. Give us the depth, the groundwater and the surface and the range collapses quickly.

What actually moves a unit price the most?

Four things, roughly in order. Depth, because past about twelve feet the trench needs an engineered support system and production per day falls sharply. Groundwater, because dewatering changes the method and adds a day rate. Congestion, because a line threading between existing utilities advances at a fraction of open-field speed. And the surface, because replacing arterial pavement with staged traffic control costs more than replacing a field. The pipe itself is rarely the main number.

Why do some lines say "site visit" instead of a price?

Because publishing a number for them would be dishonest. A tie-in to a live main or a live sewer is priced from the plant, at the plant, with the operators present: what carries the flow, what the fallback is, what season it can be done in, how long the window is and what happens if it overruns. Those are not attributes of the pipe, they are attributes of your system, and no web page knows them.

What is not in these prices?

Engineering, surveying, permitting, bonds and insurance, owner-furnished materials, easement and right-of-way acquisition, and any applicable tax. They also assume normal access and no undisclosed site conditions. On a public project the bonds and insurance alone are a real percentage, and it is better to carry them as their own line in your budget than to be surprised by them inside somebody's unit price.

Are these your bid prices?

No, and that distinction matters. These are planning ranges for this class of work in this market, published so a district can size a project before it spends money on design. A bid is a fixed price against a defined scope, a schedule, a set of drawings and a specification, and it is a commitment. If you need a commitment, you need a bid or a proposal, and those come from documents rather than from a table.

Does self-performing the work make it cheaper?

Sometimes, and reliably it makes it more predictable, which on a live plant is worth more. When the excavation, the concrete, the pipe and the site work all belong to one firm, the sequence compresses to what the work needs instead of to what four schedules can agree on, and there is nobody to argue with about whose delay it was. What it genuinely removes is subcontractor mark-up and the coordination float that gets built in to cover somebody else's crew not turning up. See what we self-perform.

How often are these reviewed?

They carry a review date, and the date is on the page rather than buried in a footer. Material and labour costs in this trade have moved sharply in recent years and a price sheet without a date on it is worse than no price sheet. If the date above is more than a year old, telephone and ask what has moved — we will tell you.

Give us four numbers and the range narrows

Length, depth, groundwater, surface. With those four we can tell you on the telephone which end of each range you are at, what has to be defined before anyone can bid it, and what the sequence would have to look like if the facility has to stay in service throughout.