RN Civil Construction, LLC

Water & Wastewater Facility and Pipeline Construction Englewood, Colorado Mon–Fri 7:00 AM–4:30 PM

G 1.0

A Colorado civil contractor, since 2002

RN Civil Construction, LLC builds and rebuilds the water and wastewater infrastructure that Colorado municipalities and special districts depend on. Most of that work happens on facilities that cannot be switched off, which is the constraint the whole company is organised around.

The company was founded in 2002 by Daniel P. Niehus and has worked in Colorado ever since. It is a heavy civil contractor in the specific sense: water and sewer lines and related structures, NAICS 237110, for public owners.

What distinguishes the work is not a claim about quality, which every contractor makes and no reader can check. It is a structural fact about how the work is staffed: we self-perform more than 75% of a typical project with our own workforce and our own equipment. The excavation, the cast-in-place concrete, the pipe, the structures, the selective demolition, the bypass and the site work are all done by people on our payroll.

On an ordinary job that is a cost argument. On a plant that has to keep meeting its permit while it is rebuilt, it is a risk argument, and the risk argument is much stronger: the sequence compresses to what the work needs rather than to what four subcontractors' schedules can agree on, and at two in the morning during a tie-in, the crew is people whose previous tie-ins we have watched.

That page — what we self-perform — also sets out four ways to verify the claim rather than take it, because a self-performance figure is the easiest thing in this industry to assert and one of the easiest to check.

What we are organised around

A wastewater treatment plant cannot be switched off. The discharge permit has no construction exemption in it, and the collection system keeps delivering flow whether or not there is anywhere for it to go.

Nearly every municipal plant project in Colorado is therefore a retrofit. Cities do not build new plants often; they expand, upgrade and replace what they have, usually because a permit limit tightened or the population grew. So the work arrives as a new structure plus a tie-in, a pipeline plus a shutdown, a pump station plus a bypass — and the second half is where the risk lives.

Everything about how we run a project follows from that: the bypass sized on peak wet-weather flow and proven before anything is demolished, the tie-in treated as a written operation rather than a construction activity, the three hold points on the process page. None of it is unusual practice. What is unusual is writing it down where an owner can read it before awarding work.

Who the work is for

Municipalities, water and sanitation districts, metropolitan districts, and the consulting engineers who design for them. We also work as a civil subcontractor to general contractors where a building scope dominates and the utility and site work is one part of a larger project.

Those owners have obligations we do not: public procurement, prevailing wage, bonding, reporting to a board, and a discharge permit with their name on it. A contractor who makes any of those harder is a contractor who costs more than the bid.

The audience we actually build for

An engineer reads the sequence. A public works director reads the risk. A finance officer reads whether the number holds. A board reads one page.

And then, long after all four have moved on, an operator lives with the facility every day for thirty years. Valve access, clearance to pull a pump, whether a walkway is usable in February, where the hose bib is — those are the things a plant is actually judged by, and they are worth raising during construction rather than discovering at startup.

The operators are the last audience and the most important one, which is why the closeout package and the training are a milestone rather than an afterthought.

ContractorNAICS 237110

RN Civil Construction, LLC

6025 S Quebec StEnglewood, CO 80111
Telephone
(303) 482-3059
Email
[email protected]
Hours
Mon–Fri 7:00 AM–4:30 PM MT
Trade
Water and Sewer Line and Related Structures Construction

Registration

Legal name
RN Civil Construction, LLC
Principal
Daniel P. Niehus
Founded
2002
NAICS
237110 (2022)
Trade
Water and Sewer Line and Related Structures Construction
Federal
Registered in SAM.gov for federally assisted work

Bonding letters, certificates of insurance, prequalification submittals and SAM.gov details go to a named person who can verify them, on request.

The one number on this site

75%+ Self-performed Of a typical project, by our own workforce and our own equipment. It is the company's own claim, and the page that makes it tells you how to check it.

G 2.0 Not claimed

What this website deliberately does not say

Every item below is something a contractor's website normally asserts. None of them is on this one, and the reason is the same in each case: a number printed on a marketing page is not evidence, because the reader cannot verify it — and in public procurement the reader is specifically required to verify things.

Claims this site does not make · and how to get the real answer
Not published here How to get it
Safety statistics, EMR, incident rates Requested with a prequalification submittal, to a named person, with the current safety programme attached
Bonding capacity and insurance limits A letter from our surety and certificates naming your project and entity
Employee headcount and annual revenue On a prequalification form, where it can be checked against financials
Named clients and project counts References, with contacts who can be telephoned — not logos on a page
Photographs of completed work Field photography belongs to the project it was taken on. It is not marketing
Awards and certifications Listed on a prequalification submittal where the issuing body can be checked
A guaranteed emergency response time A contract with a named response time and a named remedy. Not a web page

What this site publishes instead is the thing almost nobody in the trade publishes: the unit prices, with their basis stated, so that a district can size a project before spending money on design. That is more useful than a wall of unverifiable numbers, and it is harder to fake.

G 3.0 Scale

When we are the wrong contractor

Self-performance is a fixed capacity, not an unlimited one, and that has an honest consequence: a project large enough that we would have to broker most of it defeats the reason to hire us in the first place.

So if a project is beyond the crews, we would rather say so at the pre-bid meeting than submit a number and find out afterwards. Equally, a single residential connection or a small repair a long way from Denver is usually better done by a local utility contractor who knows the inspectors and where the aggregate comes from.

Telling an owner that somebody else is the better fit costs us a bid. Submitting a bid we should not have submitted costs them a procurement cycle, which is worse.

The full right-and-wrong-fit table is on the scopes of work page.

Talk to the people who would run it

Not an estimator reading from a brochure. Telephone and describe the facility and the constraint, and ask who the superintendent on your project would be — then ask to talk to them. It is the single most useful question an owner can ask any contractor.

RN Civil Construction, LLC · 6025 S Quebec St, Englewood, CO 80111

Call (303) 482-3059 Contact

Mon–Fri 7:00 AM–4:30 PM MT